{"id":71834,"date":"2025-03-04T10:08:00","date_gmt":"2025-03-04T09:08:00","guid":{"rendered":"https:\/\/idec-sante.com\/?p=71834"},"modified":"2026-06-25T10:11:15","modified_gmt":"2026-06-25T08:11:15","slug":"idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50","status":"publish","type":"post","link":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/","title":{"rendered":"IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50)"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>IDEC SANT\u00c9 has successfully delivered a 16,500 sq m pharmaceutical manufacturing facility to Aptar Pharma in Granville (Manche). Delivered in four successive phases, following 9 months of design studies and 42 months of construction, this project illustrates IDEC SANT\u00c9\u2019s commitment to meeting the specific requirements of the pharmaceutical industry through the delivery of large-scale, highly technical projects.<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">APTAR PHARMA, a major player in the pharmaceutical industry<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A subsidiary of the Aptar Group, Aptar Pharma is a leading manufacturer of drug delivery systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">From its Granville facility, the company produces approximately <strong>10 billion components each year<\/strong>, including plungers for pre-filled syringes, rigid needle shields and closures for injectable vials.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To support the continued growth of its activities, Aptar Pharma entrusted IDEC SANT\u00c9 with the design and construction of a new industrial facility tailored to its operational requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A relationship built on trust at the heart of the project<\/h3>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p><em>\u00ab <\/em>This project is the result of a partnership built on a genuine relationship of trust with Aptar Pharma. From the very beginning, we worked together to address the technical and operational challenges specific to their business.<em> \u00bb<\/em><\/p><cite>C\u00e9dric de WAVRECHIN, Managing Director IDEC SANT\u00c9<\/cite><\/blockquote><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Thanks to the expertise of its integrated engineering department and the use of advanced technologies such as BIM, IDEC SANT\u00c9 was able to develop tailor-made solutions perfectly adapted to the client\u2019s requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Comprehensive support from IDEC SANT\u00c9<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">From the design phase through to construction, IDEC SANT\u00c9 mobilised its expertise to provide comprehensive support to Aptar Pharma.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For several months, the Technical Engineering Department worked closely with the client&#8217;s teams to jointly develop the project while meeting the requirements of its industrial specifications.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Designed entirely in 3D using <strong>REVIT<\/strong> and <strong>BIM TRACK<\/strong>, the project incorporates advanced architectural and technical solutions specifically adapted to pharmaceutical manufacturing, ensuring reliable coordination between all construction packages and the industrial process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">IDEC SANT\u00c9 also supported Aptar Pharma with the environmental aspects of the project, including the preparation and submission of the ICPE (Classified Installations for Environmental Protection) application and the implementation of the solutions required to achieve <strong>LEED Silver certification<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">An outstanding 16,500 sq m facility<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Covering a total surface area of <strong>16,500 sq m<\/strong>, the Granville facility includes several production areas, including controlled environment cleanrooms (ISO 5 and ISO 7), packaging and storage areas, quality control laboratories, as well as administrative and staff facilities.<\/p>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p><em>\u00ab This project perfectly illustrates our ability to design and deliver complex, highly technical facilities that meet the highest expectations of our clients. \u00bb<\/em><\/p><cite>C\u00e9dric de WAVRECHIN.<\/cite><\/blockquote><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Exemplary organisation for an ambitious project<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The construction works, organised over four phases across a period of 42 months, involved nearly <strong>220 partner companies<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This rigorous project management made it possible to meet the planned schedule while ensuring continuous coordination with the client.<\/p>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p><em>\u00ab <\/em>The success of this project is above all the result of the unwavering commitment of our teams. Their professionalism and their ability to overcome every challenge have enabled us to deliver a high-quality facility that fully meets Aptar Pharma\u2019s expectations.<em> \u00bb<\/em><\/p><cite>C\u00e9dric de WAVRECHIN.<\/cite><\/blockquote><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>IDEC SANT\u00c9 has successfully delivered a 16,500 sq m pharmaceutical manufacturing facility to Aptar Pharma in Granville (Manche). Delivered in four successive phases, following 9 months of design studies and&hellip;<\/p>\n","protected":false},"author":4,"featured_media":71496,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[54,64],"tags":[],"class_list":["post-71834","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-news-flux-grid-info-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50) - IDEC SANT\u00c9<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50) - IDEC SANT\u00c9\" \/>\n<meta property=\"og:description\" content=\"IDEC SANT\u00c9 has successfully delivered a 16,500 sq m pharmaceutical manufacturing facility to Aptar Pharma in Granville (Manche). Delivered in four successive phases, following 9 months of design studies and&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/\" \/>\n<meta property=\"og:site_name\" content=\"IDEC SANT\u00c9\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-04T09:08:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-25T08:11:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/idec-sante.com\/wp-content\/uploads\/sites\/2\/2025\/03\/Aptar-Pharma-Granville-Mars-2024-010-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1634\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Blandine\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Blandine\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/\"},\"author\":{\"name\":\"Blandine\",\"@id\":\"https:\\\/\\\/idec-sante.com\\\/#\\\/schema\\\/person\\\/e765762857ad18be879bfdd4029d6f44\"},\"headline\":\"IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50)\",\"datePublished\":\"2025-03-04T09:08:00+00:00\",\"dateModified\":\"2026-06-25T08:11:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/\"},\"wordCount\":512,\"publisher\":{\"@id\":\"https:\\\/\\\/idec-sante.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/idec-sante.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2025\\\/03\\\/Aptar-Pharma-Granville-Mars-2024-010-scaled.jpg\",\"articleSection\":[\"News\",\"News flux GRID INFO EN\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/\",\"url\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/\",\"name\":\"IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50) - IDEC SANT\u00c9\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/idec-sante.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/idec-sante.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2025\\\/03\\\/Aptar-Pharma-Granville-Mars-2024-010-scaled.jpg\",\"datePublished\":\"2025-03-04T09:08:00+00:00\",\"dateModified\":\"2026-06-25T08:11:15+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/#primaryimage\",\"url\":\"https:\\\/\\\/idec-sante.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2025\\\/03\\\/Aptar-Pharma-Granville-Mars-2024-010-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/idec-sante.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2025\\\/03\\\/Aptar-Pharma-Granville-Mars-2024-010-scaled.jpg\",\"width\":2560,\"height\":1634,\"caption\":\"site industriel pharmaceutique\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/idec-sante.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/idec-sante.com\\\/#website\",\"url\":\"https:\\\/\\\/idec-sante.com\\\/\",\"name\":\"IDEC SANT\u00c9\",\"description\":\"D\u00e9couvrez IDEC SANTE, le sp\u00e9cialiste de la conception et de la construction cl\u00e9 en main de site industriels pharmaceutique, cosm\u00e9tique et de bio-technologie\",\"publisher\":{\"@id\":\"https:\\\/\\\/idec-sante.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/idec-sante.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/idec-sante.com\\\/#organization\",\"name\":\"IDEC SANT\u00c9\",\"url\":\"https:\\\/\\\/idec-sante.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/idec-sante.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/idec-sante.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2021\\\/08\\\/logo-idec-sante-130x155-blc-fond-violet.png\",\"contentUrl\":\"https:\\\/\\\/idec-sante.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2021\\\/08\\\/logo-idec-sante-130x155-blc-fond-violet.png\",\"width\":130,\"height\":155,\"caption\":\"IDEC SANT\u00c9\"},\"image\":{\"@id\":\"https:\\\/\\\/idec-sante.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/idec-sante\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/idec-sante.com\\\/#\\\/schema\\\/person\\\/e765762857ad18be879bfdd4029d6f44\",\"name\":\"Blandine\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g\",\"caption\":\"Blandine\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50) - IDEC SANT\u00c9","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/","og_locale":"en_US","og_type":"article","og_title":"IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50) - IDEC SANT\u00c9","og_description":"IDEC SANT\u00c9 has successfully delivered a 16,500 sq m pharmaceutical manufacturing facility to Aptar Pharma in Granville (Manche). Delivered in four successive phases, following 9 months of design studies and&hellip;","og_url":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/","og_site_name":"IDEC SANT\u00c9","article_published_time":"2025-03-04T09:08:00+00:00","article_modified_time":"2026-06-25T08:11:15+00:00","og_image":[{"width":2560,"height":1634,"url":"https:\/\/idec-sante.com\/wp-content\/uploads\/sites\/2\/2025\/03\/Aptar-Pharma-Granville-Mars-2024-010-scaled.jpg","type":"image\/jpeg"}],"author":"Blandine","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Blandine","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/#article","isPartOf":{"@id":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/"},"author":{"name":"Blandine","@id":"https:\/\/idec-sante.com\/#\/schema\/person\/e765762857ad18be879bfdd4029d6f44"},"headline":"IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50)","datePublished":"2025-03-04T09:08:00+00:00","dateModified":"2026-06-25T08:11:15+00:00","mainEntityOfPage":{"@id":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/"},"wordCount":512,"publisher":{"@id":"https:\/\/idec-sante.com\/#organization"},"image":{"@id":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-sante.com\/wp-content\/uploads\/sites\/2\/2025\/03\/Aptar-Pharma-Granville-Mars-2024-010-scaled.jpg","articleSection":["News","News flux GRID INFO EN"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/","url":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/","name":"IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50) - IDEC SANT\u00c9","isPartOf":{"@id":"https:\/\/idec-sante.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/#primaryimage"},"image":{"@id":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-sante.com\/wp-content\/uploads\/sites\/2\/2025\/03\/Aptar-Pharma-Granville-Mars-2024-010-scaled.jpg","datePublished":"2025-03-04T09:08:00+00:00","dateModified":"2026-06-25T08:11:15+00:00","breadcrumb":{"@id":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/#primaryimage","url":"https:\/\/idec-sante.com\/wp-content\/uploads\/sites\/2\/2025\/03\/Aptar-Pharma-Granville-Mars-2024-010-scaled.jpg","contentUrl":"https:\/\/idec-sante.com\/wp-content\/uploads\/sites\/2\/2025\/03\/Aptar-Pharma-Granville-Mars-2024-010-scaled.jpg","width":2560,"height":1634,"caption":"site industriel pharmaceutique"},{"@type":"BreadcrumbList","@id":"https:\/\/idec-sante.com\/en\/idec-sante-hands-over-a-16500-sq-m-pharmaceutical-manufacturing-facility-to-aptar-pharma-in-granville-50\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/idec-sante.com\/en\/"},{"@type":"ListItem","position":2,"name":"IDEC SANT\u00c9 Hands Over a 16,500 sq m Pharmaceutical Manufacturing Facility to Aptar Pharma in Granville (50)"}]},{"@type":"WebSite","@id":"https:\/\/idec-sante.com\/#website","url":"https:\/\/idec-sante.com\/","name":"IDEC SANT\u00c9","description":"D\u00e9couvrez IDEC SANTE, le sp\u00e9cialiste de la conception et de la construction cl\u00e9 en main de site industriels pharmaceutique, cosm\u00e9tique et de bio-technologie","publisher":{"@id":"https:\/\/idec-sante.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/idec-sante.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/idec-sante.com\/#organization","name":"IDEC SANT\u00c9","url":"https:\/\/idec-sante.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-sante.com\/#\/schema\/logo\/image\/","url":"https:\/\/idec-sante.com\/wp-content\/uploads\/sites\/2\/2021\/08\/logo-idec-sante-130x155-blc-fond-violet.png","contentUrl":"https:\/\/idec-sante.com\/wp-content\/uploads\/sites\/2\/2021\/08\/logo-idec-sante-130x155-blc-fond-violet.png","width":130,"height":155,"caption":"IDEC SANT\u00c9"},"image":{"@id":"https:\/\/idec-sante.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/idec-sante\/"]},{"@type":"Person","@id":"https:\/\/idec-sante.com\/#\/schema\/person\/e765762857ad18be879bfdd4029d6f44","name":"Blandine","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1d4e0f1344634e244c47826f468fd847db429ab6f759c3ff754a1a23b74f2f3b?s=96&d=mm&r=g","caption":"Blandine"}}]}},"_links":{"self":[{"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/posts\/71834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/comments?post=71834"}],"version-history":[{"count":1,"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/posts\/71834\/revisions"}],"predecessor-version":[{"id":71835,"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/posts\/71834\/revisions\/71835"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/media\/71496"}],"wp:attachment":[{"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/media?parent=71834"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/categories?post=71834"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/idec-sante.com\/en\/wp-json\/wp\/v2\/tags?post=71834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}